endobj 0000005681 00000 n Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. At TenCate ourgoal is your success. Center splash basin . When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. Concrete canvas (CC) has the potential to become a widely used slope protection material owing to advantages such as flexibility, fast construction with low labor costs, and quick strength development. Soil Stabilization Matting - Slope Application, Clear Water Pipe Through Silt Fence/Super Silt Fence, Temporary Stone Outlet Structure (1 of 2, PDF only), Temporary Stone Outlet Structure (2 of 2, PDF only), Temporary Gabion Outlet Structure (1 of 2, PDF only), Temporary Gabion Outlet Structure (2 of 2, PDF only), Standard Inlet Protection (1 of 2, PDF only), Standard Inlet Protection (2 of 2, PDF only), Combination Inlet Protection (1 of 2, PDF only), Combination Inlet Protection (2 of 2, PDF only), Pipe Outlet Sediment Trap ST-I (1 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (2 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (3 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (1 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (2 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (3 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (1 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (2 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (3 of 3, PDF only), Concentric Trash Rack and Anti-Vortex Device (1 of 2, PDF only), Concentric Trash Rack and Anti-Vortex Device (2 of 2, PDF only), Types of Couplers for Corrugated Steel Pipe, Sediment Basin Schematic - Horiz. Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. 0000002021 00000 n For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. Angular shaped rock may be used on any planned slope. 2 0 obj RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. endobj If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. The devices include ground covers and channel liners such as: 1. stream In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. xZrFou D[&! % %PDF-1.3 % endobj If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. When placing rocks, the contractor should ensure each placed rock is stable and not dependent on the one on top to hold it in place. If extensive slope protection problems are anticipated or encountered during construction, refer these to the design engineer and the project manager, who may in turn obtain the advice of the Caltrans Bank and Shore Protection Committee.. Products with a are available to meet BABA (Build America, Buy America) requirements. This information is to be used only as a guide. IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. 0000013346 00000 n Mirafi 180N is a moderate weight nonwoven geotextile that meets AASHTO M288 Class 1 geotextiles for separation and subsurface drainage. (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. %PDF-1.4 1, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. <>/XObject<>/Properties<>>>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> The contract will identify the designated method. (One call ordering and delivery). US Fabrics is proud to serve the geotextile needs of the State of Califronia, including: Los Angeles, San Diego, San Jose, San Francisco, Fresno, Sacramento, Long Beach, Oakland, Bakersfield, Anaheim, Santa Ana, Riverside, Stockton, Chula Vista, Fremont, Irvine, San Bernardino, Modesto, Oxnard, Fontana, Moreno Valley, Glendale, Huntington Beach, Santa Clarita, Garden Grove, Santa Rosa, Oceanside, Rancho Cucamonga, Ontario, Lancaster, Elk Grove, Palmdale, Corona, Salinas, Pomona, Torrance, Hayward, Escondido, Sunnyvale, Pasadena, Fullerton, Orange, Thousand Oaks, Visalia, Simi Valley, Concord, Roseville, Santa Clara, Vallejo, Victorville, El Monte, Berkeley, Downey, Costa Mesa, Inglewood, Ventura, West Covina, Norwalk, Carlsbad, Fairfield, Richmond, Murrieta, Burbank, Antioch, Daly City, Temecul and all other areas of California. (800) 518-2290, Providing the most comprehensive geosynthetic lines in the industry. <> Contact Us << /Length 5601 Source: Caltran Highway Design Manual, Chapter 870 (You may enter part of the word or the whole phrase). Place a layer (six inch minimum) of 9 0 obj 2019-07-30T13:47:33-04:00 Draw Down Device, Temporary Access Bridge (1 of 2, PDF only), Temporary Access Bridge(2 of 2, PDF only), Temporary Access Culvert (1 of 2, PDF only), Temporary Access Culvert (2 of 2, PDF only), Onsite Concrete Washout Structure (1 of 2, PDF only), Onsite Concrete Washout Structure (2 of 2, PDF only), If you are experiencing difficulty accessing these details or if there are anyquestions, please contact the Sediment, Stormwater & Dam Safety Program at (410) 537-3543 or by email (Amanda.Malcolm@maryland.gov, National Human Trafficking Hotline - 24/7 Confidential. Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. Keep records up to date. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. Draw Down Device, Sediment Basin Schematic - Vert. with a minimum of 50% of the stones . Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Your search for great running gear starts and ends with us. the contract cost database using the most recent year of data. The maximum height of the vertica l lower portions 3.5 feet. Please enable JavaScript in your browser. +NXR!ft]l|\P2. 6 0 obj (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. endobj 1. The heavier fabrics provide more strength and are less likely to tear when large class II or Class III boulders are placed on them. At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Erosion control is an important element of successful slope protection. Transportation Specifications Section 96-1.02I for Rock Slope Protection Fabric, Class 8, nonwoven geotextile. Properly designed slope protection and stabilization has to include two components: a vegetational-biological and a mechanical-structural component. <> Information reported to the hotline in the past has helped to eliminate certain fraudulent activities and protect State resources. The samples will be crushed in the laboratory to sizes needed to perform tests. Smooth the graded foundation. Click on the to search for an item in Before placement of the broken concrete, inspect the material and be sure the reinforcement has been removed flush to the surface of concrete. Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS are available to meet BABA (Build America, Buy America) requirements. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. <> To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. {.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Decide whether modifications are necessary as a result of changed conditions. . Copies of these details are made available below in both Adobe Portable Document Format (PDF) and AUTOCAD Drawing (DWG) file formats. For details about concrete production, review Section 4-90, Concrete, of this manual. application/pdf <> Rock Channel Protection Paved Gutter 601.13 Basis of Payment 601.01 Description. >> Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. (see Riprap Slope Protection Worksheet). Properly designed and planted vegetative covers play The gabions are placed on filter fabric as detailed in the plans and specifications. Polypropylene is stable within a pH range of 2 to 13. Use 5 to 7 st Need quick pricing on Erosion Control Fabric? {s9y^ Rock grading and quality requirements per Standard Specifications. Enter the item description of the code you wish to search for: Close observation is required during rock placement to detect any damage to the fabric. Observe construction to ensure the contractor does the placing, finishing, and curing as specified. =w (j($M/!bMbo,iDjQL1{L! 0000004037 00000 n <>/Metadata 7 0 R/OpenAction 8 0 R/Outlines 110 0 R/PageLayout/SinglePage/PageMode/UseOutlines/Pages 11 0 R/StructTreeRoot 137 0 R/Type/Catalog/ViewerPreferences<>>> This work consists of protecting slopes, channels, and gutters with riprap, interlock precast concrete blocks, concrete, grouted items, tied concrete block mats, crushed aggregate, or rock items. Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. 3, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. Rock Slope Protection Fabric, used in slope stabilization projects (see Technical Note on Rock Slope Protection / Rip Rap) When required by the Project Engineer, a Certificate of Compliance for each type of fabric being used should be issued by the supplier and furnished to the Engineer. (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. Any springs or water courses that might affect the stability of the design. If you have any questions or would like to learn more, please contact us. uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. Soil Stabilization Matting - Slope Application, Perm. Class E Revetment Erosion Stone or Class E Revetment Erosion Stone or A A Engineering Fabric Ditch Bottom 2' 2' Anchor Slot W 6'' min. State-furnished materials and expenses, as well as supplemental work items and descriptions. Click on the product name for a data sheet. FDM 10-10-3 uuid:30dd8676-a64b-4579-9ccf-fc82965d356f Consult engineer to ensure applicable design requirements are met. endobj At the start of gabion placement, require the contractor to verify the minimum unit weight of the gabions to ensure it meets specifications. Placement of Bedding Material 1. Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. Erosion control devices provide direct protection to the soil surface therefore, are considered one the best measures for preventing erosion. B. Cables. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 cIP=L ?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam -j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF /Type/ExtGState Slope protection is usually needed to protect the upstream slope against erosion due to wave action. Use the size and composition of yarn that is recommended by the fabric manufacturer. /OP true This handbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. Check the area to be protected to ensure that the required expansion joints are in place. endobj There are three material gradation requirements based on required rock layer thicknesses. 0000008354 00000 n K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. <>/Font<>>>/Fields[]>> Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. endobj RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. California Department of Transportation Benchmark inspection of sampling and testing of rocks. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. 1 0 obj Geosynthetic Bond Breaker (Call for product. Nominal RSP class by median particle diameterb Nominal median Also, ensure the contractor does not drop rock into place; otherwise, cracking or breaking may occur. Refer to Section 4-96, Geosynthetics, of this manual for guidelines on inspecting and accepting rock slope protection fabric. Proven Product Track Record (Aggregate is widely accepted and approved)Wilson Quarry Products are recognized as the Industry Standard in the Monterey Bay Area, Product meets and is Certified for Army Corp Projects. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. 1 The challenge was to construct a new taxiway over areas that were built on tidal flats and land reclaimed from Boston Harbor. Take the following steps when inspecting the work and materials for slope protection: In addition to the general functions discussed above, the following items apply to specific types of slope protection. JavaScript is required to use content on this page. Check to ensure that slopes and foundation areas are graded and compacted to specified tolerances. { , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. Fabric must be RSP fabric that complies with the class shown in the following table: Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these. Barrier Landscape Edging & Paver Edging 6'/8. Manufacturers information can be found at: 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. endobj 2019-07-30T13:47:33-04:00 Ensure that rocks of the specified sizes and shapes are being used. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0 0=F5VvL(^f item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) AASHTO is typical mass of 4.1 sy/oz.. Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. Retaining Walls & Slope Stability Values shown are based on Table 873.3A dimensions and an assumed specific gravity of 2.65. requirements. For details about concrete production, review Section 4-90, Concrete, of this manual. Our TerraTex brand offers full-spectrum performance delivery - groundwater filtration and drainage, soil separation and reinforcement, geomembrane protection, sprayed liner substrate, oil-and-gas industry drilling pad and access-road enhancement, as well as pavement overlay and bond-breaker applications. Vegetation (see . It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Cold storms bringing wind, rain and low-elevation snow heavy at times are forecast through early March. All rights reserved. Provide galvanized guide rail cables a minimum 19 mm in diameter, consisting . 0000012187 00000 n Review contractors verification of unit weight of rock-filled gabions. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. To better control the contractors selection of rocks for placing, ensure the contractor paints tonnage on large rocks used in foundation construction. Standard contract items and descriptions for Caltrans projects. :t4NV]j{/mtqF*sx[%M 5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. e&C+uPaN.%y5*>EJ9gcD,i4E|+I,b0 f)#H+E m:(B(u1b)Q%>cayKh 0SYB@RenkJ1HJ b#'mYtQS1 HU" 2`VoVsB: ~',2g(5DZsHrxUR5~4 4_ {YNjTjdV \ (aazR#;@1""(*$4"!f)G(J If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. Other Names Rock Slope Protection. 0000015681 00000 n The contract plans will designate the required rock layer thickness for each location. Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. KEwAx{N*$J }COpU?s{bs. endstream Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. These products can be used in areas where they meet the local agency requirements. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . Ensure that the contractor performs concrete finishing as specified and that the slope paving is cured by one of the specified methods. 0000011079 00000 n For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. 3. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. 0000005658 00000 n The equilibrium soil-to-geotextile system that allows for adequate movement of a liquid across the plane of the geotextile with limited soil loss over the service lifetime of the application. 0000007052 00000 n 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). /OPM 1 Start by choosing whether your patio is a **single rectangle** or if it has a different shape, in which case you. 0000000871 00000 n Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. 99 (30% off) Best Selling Saucony Flat Mask By mrhzid $8. Project Details For EA 04-0A0204 ITEM NUMBER 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) Bid Opening Date (mm-dd-yyyy): 04-21-2021 District-County-Route-Postmile: 04-SON-1-R15./R15.7 Quantity: 220 SQYD Unit Price: $21.50 Total Price: Type of work: REALIGN ROADWAY 5. Riprap is typically placed along graded ditch, channel, and shoreline banks over geotextile, which prevents erosional undercutting. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. Obtain initial samples and have them tested for the specified attributes. If necessary, order additional weep holes. Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. NTPEP Datamine Information: RG80NC is a tracking model number for the following manufacturers products: Mirafi 180NC, SKAPS GE180/GT180C or Propex 861. Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. 0000008331 00000 n Click on the to send the number to the The concrete slope protection method consists of paving the embankment with portland cement concrete. TAR_%R5Wa%*x4ux-x5d1c iU:v9b!KXGcFK 1fN2 t K! @>|0fWp^,Y/T!*gprE."8hjjJ7kUfmYxTsX"CfU2TL]Gdb_Kg,GA/`U)H!hkJARD[R` ), Geocomposite Wall Drain (w/ 6oz on 1 or 2 sides - Please specify.). Erosion Control Fabrics featured here have been used in a wide range of applications including slope stabilization, sediment containment, runoff filtration, home protection, and vegetative regrowth. Rock Slope Armor is a layer of rock, such as ditch lining rock, cobble rock, concrete rubble, or riprap, which is hand or mechanically placed on an erodible soil slope. Geotextiles. Test panels may be specified in the special provisions. main search page where you can specify additional parameters. Type R. Use stones between 50 and 250 lb. | Conditions of Use | Privacy Policy Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. endobj - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO.

Month Delayed Activation Bt Sport, Articles R